0 / 0
Creating the flow (SPSS Modeler)

Creating the flow

  1. Create a new flow and add a Data Asset node that points to catalog_seasfac.csv.
  2. Connect a Type node to the Data Asset node and double-click it to open its properties.
  3. Click Read Values. For the men field, set the role to Target.
    Figure 1. Specifying the target field
    Specifying the target field
  4. Set the role for all other fields to None and click Save.
  5. Attach a Time Plot graph node to the Type node and double-click it.
    Figure 2. Plotting the time series
    Plotting the time series
  6. For the Plot, add the field men to the Series list.
  7. Select Use custom x axis field label and select date.
  8. Deselect the Normalize option and click Save.
  9. Run the flow.
Generative AI search and answer
These answers are generated by a large language model in watsonx.ai based on content from the product documentation. Learn more