0 / 0
Setting the time intervals (SPSS Modeler)

Setting the time intervals

  1. Add a Time Series node and attach it to the Type node. Double-click the node to edit its properties.
  2. Under OBSERVATIONS AND TIME INTERVAL, select DATE_ as the Time/Date field.
  3. Select Months as the time interval.
    Figure 1. Setting the time interval
    Setting the time interval
  4. Under MODEL OPTIONS, select the Extend records into the future option and set the value to 3.
    Figure 2. Setting the forecast period
    Setting the forecast period
Generative AI search and answer
These answers are generated by a large language model in watsonx.ai based on content from the product documentation. Learn more