0 / 0

Copy stage: fast path (DataStage)

Last updated: Mar 12, 2025
Copy stage in DataStage: fast path

This section specifies the minimum steps to take to get a Copy stage functioning.

About this task

IBM® DataStage® has many defaults which means that it can be very easy to include Copy stages in a job.

Procedure

  1. Ensure that metadata has been defined for input link and output links.
  2. On the Output tab, click Edit in the columns section and in the Maps from input column, specify how the input columns of the data set being copied map onto the columns of the various output links.