Associating link indices with links (DataStage®)
You can associate link indices with links when there are multiple input links.
Procedure
- On the job design canvas, double-click the input link icon (that connects to the Java Integration Stage icon) for which you want to change the order.
- Select the Link Ordering tab. This tab allows you to specify how output links correspond to numeric link labels. The numeric link label corresponds to the index of the link accessed through the Java™ Integration Stage API. To rearrange the links, choose an output link and click the up arrow button or the down arrow button.
- Click OK to save the mapping details.